- Applies to
- Electronics and IT goods named in the Electronics and Information Technology Goods (Requirements for Compulsory Registration) Order, 2021, as amended (for example mobile phones, laptops and tablets, power adaptors and chargers, power banks, TVs, CCTV equipment, LED lamps and luminaires, and portable lithium cells and batteries). Solar PV goods under the MNRE order are also covered. Check the BIS 'Scheme II - Registration Scheme' list.
- Mark on product
- BIS Standard Mark (the registration mark) with the IS number above it and the registration number 'R-XXXXXXXX' below it. Put it on the product and/or packaging, with a reference to the BIS website (www.bis.gov.in). Devices with a built-in screen may also show the mark electronically (e-labelling), but the packaging still needs a physical label.
- Factory inspection
- Not normally required for grant. Since February 2026 the regulations list Scheme-II as a scheme 'without any assessment at site'. Conformity rests on the lab test report and the manufacturer's self-declaration, followed by market surveillance.
- Testing
- Only BIS-recognised laboratories, listed per product and standard on the BIS/CRS website, can test for registration. Under the CRS FAQ the report must be no older than 90 days when the application is submitted.
- Indian representative
- Required for foreign manufacturers (Form-IV in Scheme-II). In order of preference, the AIR is: the manufacturer's Indian liaison office, subsidiary or branch; or, if there is none, the brand owner or trademark user's office in India; or, if neither exists, a major importer or distributor with a marketing tie-up. The AIR signs a notarised affidavit-cum-undertaking accepting liability for compliance and BIS dues, countersigns applications and renewals, and must have no conflict of interest with BIS-recognised labs.
- Validity
- Under the 2026 amendment to Scheme-II, a registration is granted initially for up to five years and can be renewed for up to five years. Apply for renewal three months before expiry. The same annual fee, production statement and automatic suspension rules as Scheme-I apply. Older CRS pages still say registrations are valid for two years.
- Typical time
- The CRS portal says normal time for grant is 20 working days, processed first come first served, once a complete application is received. Lab testing time comes on top of this and depends on the lab.